Alert
Unfortunately, we are not able to proceed with your registration if you do not have the power to enter your company into a legally binding agreement with ENWIN.
Windsor, ON – ENWIN Utilities Ltd. is conducting pressure testing as part of the Windsor Utilities Commission’s Central Corridor Feedermain project near Langlois Avenue and Grand Marais Road East. The testing is necessary to ensure new watermain infrastructure meets the highest safety standards before entering service.
As part of standard industry procedures, crews will use National Sanitation Foundation (NSF) international-certified, food-grade, non-toxic dye during testing. Consequently, nearby drainage areas may appear green from the non-toxic dye used for testing. This controlled process helps verify pipe integrity and deliver safe, reliable drinking water to Windsor residents.
Testing Process Facts:
ENWIN thanks residents for their patience during this important infrastructure upgrade.
The Central Corridor Feedermain project strengthens Windsor's drinking water system for continued reliable service
About WUC and ENWIN:
The Windsor Utilities Commission (WUC) owns the water treatment and distribution system serving customers in Windsor, Tecumseh, and LaSalle. WUC maintains a contract of service with ENWIN Utilities Ltd. (ENWIN or EWU) for the management of WUC’s administrative and operational functions. WUC and ENWIN work with Windsor to provide a safe, reliable source of water for our community.
For additional information, contact:
Christopher Manzon, P. Eng. Director Engineering (Water) Email: cmanzon@enwin.com | Belinda Bulhoes Manager Corporate Communications & Public Relations Email: news@enwin.com
|