Customers may choose to perform maintenance on their electrical infrastructure which could include:
Some maintenance may require a cut/reconnect request from ENWIN. Cut/Reconnect requests must be made at least 3 days in advance of the date required. As a service to our customers, we offer one free cut/reconnect on regular time for a service address per year. This excludes cut/reconnects for the purposes of connecting a generator to the system or those required outside of regular time.
When contacting ENWIN for a service relocation, please have the following information available:
Modification to electrical infrastructure will require Electrical Safety Authority (“ESA”) Inspection prior to reconnection. Contact ESA if you are unsure if ESA Inspection is required.
To request a cut/reconnect, please contract our Technical Services Department by e-mail at tsd@enwin.com.