Water Projects and Construction

Current list of proposed Capital Watermain projects:

2023 Watermain System Renewal Program

Water Capital System Renewal Map

Water Specifications:

Design Guidelines & Specifications - November 2022
If you require any part of this document in an accessible format, please contact Water Division Customer Service at 519-255-2727, ext. 824.

Acceptable Water Meter Installation Locations:

Properties requiring multiple meters shall only install the water meters in areas approved by ENWIN/WUC.  Water meters shall be installed in one location per WUC Design Guidelines and Specification Drawings provided in the link below.  Water meters cannot be installed by combining different Specification drawings.  They shall only be installed in one location.

Acceptable Water Meter Locations